Skip to content

Constructing London

Primary Menu
  • Home
  • Get in touch
  • Newsletter
  • Privacy Policy
  • Home
  • London boroughs
  • Hillingdon
  • Masterplan submitted for the redevelopment of Hillingdon Hospital

Masterplan submitted for the redevelopment of Hillingdon Hospital

Admin 25/07/2022 3 min read
2022-07-23 (2)

In September 2019, the Hillingdon Hospitals NHS Foundation was announced as one of the twenty-one hospitals to receive a share of seed funding.

The funding was to allow to development of a business case for the redevelopment of the hospital which includes the need to secure planning permission.

The hybrid planning application which has been submitted to the London borough of Hillingdon proposes an entirely new hospital, consolidated car parking, and mobility hub as well as new open green space in the detailed component.

A separate outline competent includes initial plans for 327 new residential units to the east of the site, with 50% affordable housing based on a habitable room measurement. Detailed plans for this will be submitted in a separate detailed application in the future.

Proposed mobility hub and new hospital building in the background, image credit IBI Group.

The aging hospital which is the main hospital for The Hillingdon Hospital NHS Foundation is the main site for the trust and provides services not just for Hillingdon, but also for Ealing, Harrow, Buckinghamshire, and Hertfordshire.

Many parts of the hospital were built in the 1940s as emergency wartime accommodation, which is still in use today. A report conducted in 2021 identified that 80% of the hospital building will require major repair or replacement soon.

If all major repairs were undertaken to eradicate the high-risk backlog it would cost in excess of £124 million and would not be a long-term solution.

A 250-year history can be traced showing the importance of healthcare provision in this part of London, however, the onset of World War II brought a stop to plans to build a permanent Hillingdon Hospital. ‘The redevelopment of Hillingdon Hospital saw a new modern general district hospital of 834 beds after World War II.

The various buildings that make up the Hillingdon Hospital estate.

The site as it is known today is dominated by the Maternity Hospital (tower and podium elements) which was completed on the 10th of January 1967. The second phase that was planned to complete in the 1970s for the temporary buildings in the south of the site was never started.

The site is dominated by the tower and podium building that was completed in 1967 with a mix of hospital buildings scattered across the site.

Many of the acute beds are in single-story wards built in the 1960s which are interspersed with pockets of surface-level car parking with pockets of low-grade landscaping.

The site is dominated by surface-level car parking with little to no access to pedestrian infrastructure. There are 1,087 parking spaces on site, with 698 of these for staff and 389 for public/visitors on the Hillingdon Hospital Site.

Proposed new hospital buildings and public open space

The scheme which is likely to be approved would be delivered over four phases with the delivery of the whole scheme likely to take over a decade to fully build out with completion likely to be in the early to mid-2030s.

In accounting terms, new hospitals have a “useful life”, of 60 years from completion which means that the scheme will serve the local area well into the 2090s at the absolute minimum.

A more efficient less and private car-dominated, Hillingdon Hospital estate, is also demonstrated through the creation of a new restricted use road through the heart of the site. This will be strictly for ambulances and buses with automated gates at each end to speed up journey times.

Improvements to the patient experience include better connectivity between departments making it easier to move patients through the hospital as well as a significant increase in the number of private side rooms.

CGI’s of the new patient areas, image credit IBI Group.

For the latest news and updates, follow Constructing London on Twitter and Instagram.

Continue Reading

Previous: Contentious 515 new homes poised for approval in Stonebridge Park
Next: 614 new and replacement homes proposed for the Aylesbury Estate

Related News

Screenshot 2024-06-08 130705
3 min read

Redevelopment proposed for Uxbridge High Street

Admin 10/06/2024
download
2 min read

Grade II* offices in Hayes set for an residential refurbishment

Admin 29/08/2023
The current site of Phase 1 subject to detailed planning permission. Image credit Google Street View.
3 min read

261 Net New Homes Proposed by Hillingdon Council

Admin 03/01/2022
  • Plans submitted for 903 homes for Deptford
  • 34 floor residental high-rise proposed for Battersea
  • Plans for 1,064 homes at Harrow’s former Civic Centre submitted
  • Plans in for Dalston’s Kingland Shopping Centre
  • Plans in for North Finchley Town Centre redevelopment
Copyright © All rights reserved. | MoreNews by AF themes.
Your consent is important to us
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies.
Do not sell my personal information.
Cookie SettingsAccept
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
Powered by CookieYes Logo