Skip to content

Constructing London

Primary Menu
  • Home
  • Get in touch
  • Newsletter
  • Privacy Policy
  • Home
  • London boroughs
  • Newham
  • Department For Levelling Up Proposes School and New 319 Homes in Newham

Department For Levelling Up Proposes School and New 319 Homes in Newham

Admin 14/02/2022 3 min read
2022-02-11 (1)

Ariel view of the proposed masterplan

Hybrid proposals by the applicant Department for Levelling Up, Housing & Communities (DLUHC) for a vacant brownfield site adjacent to Plaistow tube station in the London borough of Newham, with detailed plans submitted a new secondary school for 800 pupils with plans for 319 new homes featuring a building of 19 floors contained within the outline masterplan.

The roughly 1.71 broadly triangular in shape that was previously used as a Ford Dealership and Repairs Workshop, were vacated by September 2017 and subsequently demolished in 2021.

The site is less than 1 mile away from West Ham underground and National Rail station, this is in addition to local bus services to Walthamstow, Stratford, Beckton and North Woolwich which gives the site excellent access to the public transport rating of PTAL rating of 6.

Construction is underway for the Populo Living ‘Plaistow Hub’ development comprising a 23 storey tower comprising residential, retail and a gym at London Road adjacent to Plaistow Station, plus a 6-15 storey building comprising residential and a new neighbourhood centre at Valletta Grove.

Ariel view of the proposed site and surrounding area, image credit Google Maps.

Detailed plans for the site at 259 Plaistow Road include a four-form secondary school for 800 pupils and 100 staff, external space for three outdoor sports areas including one of the roofs of the four-storey school and improved landscaping and public realm measures.

The proposed secondary school will be run by the ‘Big Education Trust’ who already run the Ofsted Outstanding School 21 in Newham.

The school concept is one of ‘small learning communities, dividing student and teaching bodies into smaller units across the building, leading to an internal layout ordered by different school years (lower, middle and upper school).

Plans prepared by architects Allford Hall Monaghan Morris are behind the detailed plans for the school, with the architect who had previously designed the critically acclaimed; Cobham Academy, Bruntwood School and the Westminster Academy.

The proposed four-form secondary school, image credit AHMM.

Within the outline element which will be subject to a separate detailed reserved matters application in due course, chiefly among them are the 319 new homes across four buildings ranging from 5 to 19 floors.

The Proposed Development will provide 28.8% affordable housing by unit (31% by habitable room) within Phase 2. This is the maximum that can be reasonable delivered on-site as demonstrated by the supporting Financial Viability Appraisal prepared by Montagu Evans.

In accordance with Local Plan Policy H2 (Affordable Housing), the indicative affordable housing mix is offered at a 58 / 42(%) split between social rent and intermediate housing.

As Phase 2 is provided in the outline, it is understood that this will be subject to further viability review at the Reserved Matters stage to ensure that affordable housing delivery is maximised. The current indicative mix is set at 227 for market sale, 53 for social/affordable rent and 39 for intermediate (shared ownership).

Digital artist visualisation of the prosed scheme from Plaistow Station, image credit AHMM.

Whilst it is unclear who will own and manage the residential element which is proposed at this time as an outline application, it is expected that this will be sold to another entity who exactly remains to be seen.

Continue Reading

Previous: Over 3000 New Homes Set for Planning in North Kensington
Next: Builders Merchant Proposes 179 New Flats Above Southwark Flagship Store

Related News

Bob 1
3 min read

Plans in for an £1bn London Cancer Centre

Admin 16/06/2025
Tower 1
5 min read

Co-living conversion plans submitted for Chiswick Tower

Admin 09/06/2025
28
4 min read

688 dwellings and culture venue for Elephant & Castle proposed

Admin 02/06/2025
  • Plans in for an £1bn London Cancer Centre
  • Co-living conversion plans submitted for Chiswick Tower
  • 688 dwellings and culture venue for Elephant & Castle proposed
  • Plans submitted for 903 homes for Deptford
  • 34 floor residental high-rise proposed for Battersea
Copyright © All rights reserved. | MoreNews by AF themes.
Your consent is important to us
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies.
Do not sell my personal information.
Cookie SettingsAccept
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
Powered by CookieYes Logo